Mella Paint Blog

Guides, technical notes and case studies on epoxy flooring for factories, warehouses, malls and hotels, written by the people who install it.

Showing 13 posts

Guides · 12 September 2026 · 7 min read

How long an epoxy floor takes, and what decides it

Area, the state of the slab, and the wait between coats set the schedule, not the size of the crew.

Read more
Workers coating a large industrial floor
GuidesWorkers coating a large industrial floor

12 September 2026 · 7 min read

How long an epoxy floor takes, and what decides it

Area, the state of the slab, and the wait between coats set the schedule, not the size of the crew.

Read more
Technical & MaterialA glossy warehouse floor reflecting the ceiling lights

8 September 2026 · 8 min read

Self levelling epoxy versus standard coating, and when to use which

Thickness, crack coverage, and cost per metre differ sharply. The load decides, not the look.

Read more
GuidesA cleared industrial warehouse

2 September 2026 · 4 min read

What to prepare before the epoxy crew arrives

A cleared area, three phase power, and truck access. These hold up mobilisation more than anything else.

Read more
By IndustryFactory workers in masks and white coats on a production floor

26 August 2026 · 11 min read

Epoxy floors for food and pharmaceutical plants: a different specification

Seamless, coved at the walls, resistant to cleaning chemicals, and when a PU system is the better fit.

Read more
Case StudiesA Mayora plant corridor with a green epoxy floor and yellow lane lines on both sides

19 August 2026 · 5 min read

Case study: a 2,000 m2 Mayora factory floor, laid without stopping production

The plant kept running, so the work was scheduled zone by zone with extra crew in non-production areas. Done in 21 working days.

Read more
MaintenanceA person using a floor scrubber inside a building

12 August 2026 · 5 min read

How to keep an epoxy floor from dulling early

Fine grit walked in day after day wears the surface faster than forklift load does.

Read more
Technical & MaterialA crack in a concrete surface

5 August 2026 · 12 min read

Concrete moisture: the most commonly missed cause of epoxy failure

A coating that lifts after three months is usually not the product. It is water vapour from below.

Read more
By IndustryThe Mitsubishi Lautan Berlian workshop with a green epoxy floor and white lane markings

29 July 2026 · 7 min read

Workshop and automotive floors: oil resistant, load bearing, still tidy

Oil and brake fluid ask for a different chemical resistance than a dry warehouse does.

Read more
Case StudiesA red parking zone at Supermal Karawaci with white lane markings and parked cars

22 July 2026 · 5 min read

Case study: a 2,700 m2 Supermal Karawaci car park, one colour per zone

An uneven slab crusted with old residue was ground level, then coated zone by colour zone. Done in 15 working days.

Read more
Technical & MaterialA forklift parked inside a warehouse

15 July 2026 · 6 min read

How long does an epoxy floor last in a forklift aisle?

Coating thickness, wheel type, and traffic pattern decide how long it holds.

Read more
GuidesAn empty modern warehouse interior

8 July 2026 · 7 min read

Epoxy or floor hardener for a warehouse?

How to choose on load, chemical exposure, and the cleaning standard the area has to meet.

Read more
GuidesTwo workers checking an empty warehouse

1 July 2026 · 5 min read

Concrete condition checklist before epoxy work

Moisture, cracks, and old coatings to check before the site survey.

Read more
GuidesBlack and yellow chevron markings around a granite feature on the Jakarta Stock Exchange car park floor

7 March 2025 · 5 min read

Upgrading a car park floor with epoxy coating that looks the part

Protection against oil and tyre scuff, plus a far tidier look, in one coating.

Read more

How to read the posts on this blog

This blog is written from what our team sees on site and at the plant. To keep it from being misread, note the following:

  • General information. Posts here explain common principles and practice. They are not a technical specification or a recommendation for your project.
  • Numbers depend on the site. Thickness, duration and cost always depend on the slab, the load and site access. We only give firm numbers after a survey, in a written quotation.
  • Case studies describe their own project. The area, schedule and result in a case study belong to that project. Results in another building can differ.
  • Illustrative photos. Some photos on this blog are illustrations, not documentation of Mella Paint projects, unless stated otherwise.
  • Third-party brands. Product names and brands of other companies mentioned in a post remain the property of their owners.

The full terms are on the Disclaimer page.

Have a question, or need a quotation?

Send us your facility type and approximate area. We will schedule a site survey and prepare a written quotation.

OfficeKomp. Green Ville Blok AW No.16, Duri Kepa, Kebon Jeruk, West Jakarta 11510
FactoryTangerang, Banten
HoursMonday to Friday, 09.00 to 17.00 WIB
WhatsApp Us