

MPEX767 SL at a glance
What is the MPEX767 SL system made of?

- 04Dry in 12 hrsMPEX767 Top CoatThe coloured finish that takes the load, chemicals and wear.
- 03Middle layerSelf-levellerFlows and levels itself into a thick, smooth layer.
- 02Dry in 3 hrsMPEX767 Primer CoatSeals the concrete pores so the next layer bonds firmly.
- 01BaseConcrete floorThe substrate, levelled and cleaned before coating.

Why MPEX767 SL
- 01Seamless surfaceLevels itself, with no gaps for dirt to settle in.
- 02Takes heavy loads500 microns minimum, built for forklifts and vehicles.
- 03Chemical resistantProtects the concrete from spills and mops clean.
- 04Fast dryingPrimer 3 hours, top coat 12. Can be done zone by zone.
- 05Anti-slip optionFor wet areas and car park ramps.
- 0612 standard coloursOr ask us about a custom colour on WhatsApp.
12 standard MPEX767 SL colours
Quote the colour code when you order. On-screen colours are approximate and can differ from the finished floor.
- Diamond WhiteMEL-011
- Moon GreyMEL-021
- Graphite GreyMEL-022
- Ivory BeigeMEL-031
- Satin CreamMEL-032
- Prestige YellowMEL-041
- Ember GoldMEL-042
- Imperial RedMEL-051
- Jade GreenMEL-061
- Forest GreenMEL-062
- Sky BlueMEL-071
- Royal BlueMEL-072
Need a colour outside the catalog? Ask on WhatsApp.
Ask about other coloursWhat floors is MPEX767 SL used on?
Industrial and commercial floors with heavy loads, chemicals and high traffic.


Car parks & malls

Hotels & apartments

Ports
Also for generator rooms, transformer rooms, chiller rooms and pharmaceutical plants.
See projects that use MPEX767Want it installed too? Our crew installs MPEX767 SL on areas from 100 m2, with a free site survey in Greater Jakarta. Discuss a project →

How do I order MPEX767 SL?
On WhatsApp. Made to order, minimum 3 pail sets.
- 01Send your requirementsFloor area, colour code and floor condition.
- 02Confirm the orderNumber of sets, price and production schedule.
- 03ProductionIn the Tangerang factory, in about 3 to 4 working days.
- 04DeliveryDelivery or factory collection is arranged on WhatsApp.
Frequently asked questions
About MPEX767 SL
How long does MPEX767 SL take to dry?
The primer coat dries in 3 hours, the top coat in 12 hours. Work is scheduled zone by zone around these dry times so the facility can keep operating.
How thick is an MPEX767 SL floor?
500 microns minimum for the full system: primer coat, self-leveller and top coat.
What is the minimum order for MPEX767 SL?
3 pail sets. MPEX767 SL is made to order in our factory, so there is no ready stock.
How much does MPEX767 SL cost?
Pricing is confirmed per order on WhatsApp, because it depends on the number of sets and the colours chosen.
Can Mella Paint install it as well?
Yes. Our crew installs MPEX767 SL on areas from 100 m2, with a free site survey in Greater Jakarta.
Send the floor area and colour code, we will work out the sets.
MPEX767 SL orders are handled on WhatsApp during working hours, Monday to Friday, 09.00 to 17.00 WIB (UTC+7).