Products and materials
Does Mella Paint use other brands of coating?
No. Every project uses the epoxy coating we make ourselves, sold as MPEX767. Because we make it, we control its quality from colour to adhesion, and the colour can be matched to the project.
Which epoxy coatings are available?
MPEX767 SL (self-levelling) and UV Coating. MPEX767 SL is our main epoxy floor system, and UV Coating is used as a top coat. Both are described on the products page.
What are the strengths of Mella Paint coatings?
They carry heavy loads and resist chemicals, abrasion and moisture, with a clean finish. That is why they are used in warehouses, car parks, factories and other high-traffic facilities.
What finish does a Mella Paint epoxy floor have?
Gloss. The surface is shiny, looks clean and is easy to maintain.
Is an epoxy floor slippery?
There is an anti-slip option for areas prone to slipping. The standard finish is gloss. For areas that are often wet, walkways or car park ramps, we add an anti-slip layer based on the survey.
How thick is a Mella Paint epoxy coating?
At least 500 microns for the MPEX767 SL system, strong enough for forklifts and vehicles. The final thickness is matched to the loads and floor condition in the quotation.
Are patterned or decorative epoxy finishes available?
No, solid colours only. We focus on industrial and commercial floors, where durability, hygiene and easy maintenance come first. The colours are in the MPEX767 colour catalog.
Can Mella Paint coatings be used on concrete floors?
Yes, concrete is what they are made for. We check the concrete during the survey, and cracked or uneven areas are repaired before coating.
Can I order a coating with a custom specification?
Yes. Our research and production team can adjust thickness, top coat texture, colour and protective properties to suit the project. Tell us what you need on WhatsApp.
Which floor coating is right for my facility?
We recommend one after seeing the floor. Load type, chemicals in use, operating hours and the condition of the concrete decide the coating system. The recommendation and the reasons for it go into the quotation, and we keep you updated while the project runs.
Work on site
Does Mella Paint install the floors itself?
Yes, with its own applicator crew. We do not hand the work to subcontractors, so film thickness and workmanship on every project stay in our hands.
Why coat a concrete floor with epoxy?
To protect the concrete and bring maintenance costs down. Bare concrete wears, cracks and soaks up spills under foot traffic, forklifts and vehicles. An epoxy coating resists abrasion and chemicals, is easier to clean and keeps the work area looking tidy.
Is a primer needed before an epoxy coating?
Yes. The primer gives the epoxy maximum adhesion, so the floor lasts longer. In the MPEX767 SL system, the primer is the first layer on the concrete.
What if my floor is cracked or uneven?
We repair the surface before coating it. Cracks and flatness are checked during the survey and the repair goes into the quotation. For a first read, send photos of the floor on WhatsApp or to hi@mellapaint.com.
Where are epoxy floors usually used?
In industrial and commercial facilities: factories and warehouses, mall and office car parks, hotels and apartments, ports, automotive workshops, clinics and pharmaceutical facilities, creative spaces, and food and beverage production areas. Examples are on the projects page.
Do operations have to stop during the work?
Not necessarily. Work can be split into zones, so the rest of the facility keeps running. We plan the zone order and schedule with your team before we start.
When can the floor be used again after coating?
In the MPEX767 SL system, the primer dries in about 3 hours and the top coat in about 12 hours. When the area can take foot traffic, vehicles or forklifts is set per project, because film thickness and room conditions affect it.
How long does an epoxy floor installation take?
About 1,000 m2 per 7 working days, from surface preparation until the top coat has cured. The exact time depends on site conditions, area, product, operating hours, and whether the area is indoors or outdoors. Work can be split into zones so operations keep running.
Does Mella Paint take on projects outside Greater Jakarta?
Yes, for larger projects. Most of our work is in Greater Jakarta, but we also take on projects as far as Central and East Java.
Ordering and pricing
What is the minimum area for an epoxy flooring job?
100 m2. Below that, mobilisation and surface preparation costs make the job poor value, for you and for us.
How much does an epoxy floor cost per m2?
We give the price in a written quotation after the survey, because it depends on area, the condition of the concrete, the coating system and its thickness, and the schedule. Site surveys are free.
Is there a warranty?
Yes, a written warranty. Its period and coverage are set out in the project quotation and contract.
Is Mella Paint coating in stock or made to order?
Made to order, in about 3 to 4 working days. MPEX767 is ordered on WhatsApp, and the steps are on the MPEX767 page.
What is the minimum order for MPEX767 coating?
A minimum of 3 pail sets. For larger quantities, we work out the amount from your floor area on WhatsApp.
Can I get advice before buying?
Yes, at no cost. Our team will help you choose the right product or epoxy system. Reach us on WhatsApp, by phone on +62 811-1185-1767, or by email at hi@mellapaint.com.
Have a question, or need a quotation?
Send us your facility type and approximate area. We will schedule a site survey and prepare a written quotation.