
Factory & warehouse epoxy flooring
Production and storage areas with forklift traffic and heavy loads. Thick, abrasion-resistant coating with safety lane markings.

Trusted by companies that pick their vendors through tender.
The coating quality is better than the previous epoxy vendor we used.
Fast application, and the result met our expectations on schedule.
We are satisfied with the quality of the work and the finish.
The project outcome matched what we expected from the start.
The work met our expectations from start to finish.
Responsive service, and the results matched what we asked for.

That is not a technical detail. It decides who is answerable when a floor develops a problem two years after handover.
See our productsMPEX767 SL
Photos in this section are shown as shot, without grading, so the finished work can be judged on its own.

Production and storage areas with forklift traffic and heavy loads. Thick, abrasion-resistant coating with safety lane markings.

Car parks, lobbies, and corridors with heavy foot traffic. Worked in stages, outside operating hours, so the building keeps running.

Basements, service areas, kitchens, and parking. Scheduled so guests and residents are not disturbed.

Port warehouses and loading areas. The heaviest load we handle, with sea-air exposure and heavy-equipment traffic.
Also automotive, food & beverage, healthcare, and creative spaces. See all nine project categories →
Office in West Jakarta, factory in Tangerang. Most projects sit inside a one-day delivery radius, and for large-scale work we install as far as Central and East Java.
No. We install our own epoxy coating, MPEX767, made at our Tangerang factory. The applicator crew is also our own team, not a third party.
100 m2. Below that, mobilisation and surface preparation costs make the job uneconomic, for you as much as for us.
About 1,000 m2 per 7 working days, counted from surface preparation to full cure of the final coat. The work can be staged zone by zone so your operation keeps running.

12 September 2026
Area, the state of the slab, and the wait between coats set the schedule, not the size of the crew.

8 September 2026
Thickness, crack coverage, and cost per metre differ sharply. The load decides, not the look.

2 September 2026
A cleared area, three phase power, and truck access. These hold up mobilisation more than anything else.
Send us the facility type and approximate area. We'll schedule a site survey and prepare a written quotation.
Our team reviews the floor condition, the coating system that fits, and the working schedule. No cost, no obligation.
Our team will contact you on WhatsApp the same working day.